Project name: Tanzania Beixin 100,000 t/y powder and 15 million m2/y gypsum board production line upgrade project.

Location: Beixin Building Materials plant, Kibaha District, Coast Region, Tanzania.

Scale: The project covers a total building area of 14,235.37 square meters within the Tanzania Beixin plant site. It includes eight building units, with a maximum building height of 18.025 meters and a maximum span of 37 meters.

Structure: Portal steel frame structure with independent concrete foundations. The main structure is designed for a 50-year service life, with Class II fire resistance and Grade III roof waterproofing.

Schedule: September 20, 2025 to April 20, 2026.

Client: Tanzania Beixin Building Materials Plant. Designer: PRIMAPRO Architectural Design Co., Ltd. Survey: China National Building Materials Mining Investment Co., Ltd.